For the Arrow Energy Compressor Stations project we provided engineering services including:

  • Hazardous Area classification and design to AS/NZS 60079
  • Safety Instrument System consultation to AS/NZS 61511 and AS/NZS 61508
  • Electrical installation verification, pre-commissioning and commissioning support
  • Control systems support across various platforms including: Schneider TSX PLC, HIMA SIS, DeltaV Process Control and SIS, Bristol Babcock RTU’s, and Honeywell Experion. 
  • Project management for the expansion and upgrade of the sites High Voltage infrastructure, including upgrade of the main 11kV trunk supply line, HV switchgear, transformers and power factor correction equipment

Compressor Station

Figure - CSG Compressor Station